超值优惠券
¥50
100可用 有效期2天

全场图书通用(淘书团除外)

不再提示
关闭
图书盲袋,以书为“药”
欢迎光临中图网 请 | 注册
> >>
铁路隧道监控量测技术规程:Q/CR 9218-2015:英文

铁路隧道监控量测技术规程:Q/CR 9218-2015:英文

出版社:中国铁道出版社出版时间:2017-09-01
开本: 30cm 页数: 25页
本类榜单:工业技术销量榜
中 图 价:¥200.0(8.0折) 定价  ¥250.0 登录后可看到会员价
加入购物车 收藏
运费6元,满39元免运费
?新疆、西藏除外
本类五星书更多>

铁路隧道监控量测技术规程:Q/CR 9218-2015:英文 版权信息

铁路隧道监控量测技术规程:Q/CR 9218-2015:英文 内容简介

《铁路隧道监控量测技术规程(Q\\CR9218-2015 英文版)》内容包括: 1.0.1 This Specification is formulated with a view to standarding the measurement work in the design and construction of railway tunnels and making the construction monitoring meet the requirements of safety,applicability,being advanced in technology,economy and rationality. 1.0.2 This Specification is applicable to railway tunnels constructed by mining method. 1. 0. 3Monitoring shall be contained in the tunnel design and the cost of morutoring shall be included in the budget. 1.0.4 As a key procedure,monitoring shall be included in the site construction organization.For railway tunnels that may affect the surrounding buildings,third-party morutoring shall be carried out. 1.0.5 Besides this Specification,the monitoring of railway tunnels shall also conform to relevant current national standards,professional standards and standards of CHINA RAILWAY。

铁路隧道监控量测技术规程:Q/CR 9218-2015:英文 目录

1 General Provisions 2 Terms 3 Basic Requirements 4 TechnicalRequirements 4.1 GeneralRequirements 4.2 Monitoringltems 4.3 Arrangement Principle of Monitoring Cross-sections and Monitoring Points 4.4 Measurement Frequency 4.5 Control Criteria of Monitoring 4.6 Technical Requirements for Monitoring System and Instruments 5 Monitoring Methods 5.1 GeneralRequirements 5.2 Observation Inside and Outside Tunnel 5.3 DeformationMonitoring 5.4 Stress and Strain Monitoring 5.5 Contact Pressure Measurement 5 6 Blasting Vibration Monitoring ....N 5.7 Monitoring of Pressure and Volume of Pore-water 6 Data Analysis and Information Feedback 6.1 GeneralRequirements 6.2 Analysis and Processing of Monitoring Data 6.3 Monitoring Information Feedback and Engineering Countermeasures 7 Achievement Data Appendix A Record Table of Geological Condition of Excavation Face Appendix B Record Table of Tunnel Convergence Appendix C Record Table of Crown Settlement Words Used for Different Degrees of Strictness
展开全部
商品评论(0条)
暂无评论……
书友推荐
本类畅销
编辑推荐
返回顶部
中图网
在线客服